Aligned Energy (SLC-5)
Utah
            
            72MW critical load. Ground-up 450,000 SF steel structure supported on spread footings and clad with tilt wall panels. An exterior equipment yard houses generators and containerized electrical gear. Data hall conditioning is achieved using air cooled chillers and high efficiency fanwall units utilizing the Delta Cubes. The interior fit-out is four 6MW data halls with associated electrical blocks and heat rejection equipment. The project is targeted to achieve three Green Globes.
Address
                    6870 Old West Bingham Highway, West Jordan, UT
                Size
                    450,000 sq. ft.
                Architect
                    Gensler
                 
                                            

 
                